AREA WISE IDENTIFIED PROJECTS

 

I. Berhampur Municipality

Sl.

No.

Projects identified Investment

(Rs. Lacs)

Total

Capital

Power

Required

Employment

 1.

Hot dipped Galvanising

20.00

40 Kw

15

 2.

Confectionery (Mechanised)

25.00

20 Kw

10

 3.

Steel Door & Windows

8.00

10 Kw

12

 4.

Structural Fabrication

20.00

20 Kw

12

 5.

Automobile Leaf Spring

65.00

110 Kw

10

 6.

Agricultural Implements

25.00

10 Kw

20

 7.

Sophisticated Engg.    Workshop

40.00

30 Kw

15

8.

Leather / Rexin Bag

3.50

5 Kw

5

9.

PET Bottles

25.00

25 Kw

10

10.

PVC Wires & Cables

100.00

60 Kw

40

11.

Corrugated Paper Box

60.00

20 Kw

12

12.

Plastic Mat

50.00

20 Kw

10

13.

India make-II Hand Pump

120.00

40 Kw

10

14.

Cold Storage

150.00

250 Kw

14

15.

Air Conditioner & Cooler

Assembling

10.00

5 Kw

8

16.

Building Hardware

15.00

15 Kw

12

17.

Patta Sarees

5.00

1 Kw

10

18.

Ginger Oil/ Resins

2.50

7 Kw

10

19.

Mineral Warer/ Club Soda

25.00

10 Kw

12

20.

Cement Concrete Bricks

10.00

3 Kw

10

 

II. Berhampur Sub-division

 

a) Patrapur Block

----------------------------------------------------------------- 
Sl.     Projects identified       Total        Power      Employment 
No.                                          Capital     Required   
                                      Investment
                                      (Rs. Lacs) 

-----------------------------------------------------------------  

 1.     Chuda & Poha                4.50        20 Kw      05

 2.     Spices Grinding             2.50        10 Kw      05 

 3.     Ice Cream/ Ice Candy        2.25         5 Kw      03

 4.     Sugar Candy                 2.00         1 Kw      04

 5.     Repairing & Servicing       1.50         2 Kw      05
        of Automobiles

 6.     Forest Products             2.25         3 Kw      10
        ( Leaf Cup & Plates ,
        Broom Sticks)

 7.     K.B Bricks                  5.00         3 Kw      30

-----------------------------------------------------------------  

b) Digapahandi Block

----------------------------------------------------------------- 
Sl.     Projects identified        Total        Power      Emplo- 

No.                                Capital      Required   yment

                                  Investment

                                  (Rs. Lacs) 

-----------------------------------------------------------------   

 1.    Screen Printing             1.65          3 Kw       04

 2.    Bakery Product (Automatic) 12.00         20 Kw       06

 3.    Steel Furniture &           5.40         10 Kw       08

       Fabrication

 4.    Pre-cast Cement Products    3.70          5 Kw       05

 5.    Auto Repairing & Servicing  2.20          3 Kw       10

 6.    Aluminium Circles &        30.00         40 Kw       30

       Utensils                          

 7.    Granite Tiles              58.00         50 Kw       15

 8.    Maize Starch               50.00         20 Kw       10

 9.    Stone Crusher              15.00         30 Kw       25 

-----------------------------------------------------------------  

c) Kukudakhandi Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

----------------------------------------------------------------- 

 

 1.    Steel Furniture &           5.00          10 Kw      10

       Fabrication

 2.    Pre-cast Cement Products    3.00           3 Kw      05

 3.    Ayurvedic Medicine          7.50         7.5 Kw      08 

 4.    Steel Trunk                 2.00           1 Kw      03

 5.    Electrical Motor Winding    2.00           3 Kw      05

 6.    Asbestos Cement Pipe       10.00          10 Kw      05

 7.    Granite Slab Cutting &     50.00          50 Kw      20

       Polishing

 8.    HDPE Blow-Moulded          18.00          30 Kw      10

       Container

-----------------------------------------------------------------  

d) Sana Khemundi Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.    K.B Bricks                5.00          3 H.P       30

 2.    Rice, Chuda Mill         25.00         20 K.W        8

 3.    Pre-cast Cement product  10.00         10 K.W        8

       along with RCC spun pipes 

 4.    Steel Furniture &         5.00         10 K.W        5

       Fabrication

 5.    Spices & Vermicelli      10.00         10 K.W        5

-----------------------------------------------------------------  

e) Chikiti Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.    Coir Mat (Semi Automatic)   15.00       20 K.W       15

 2.    Hatchery                    94.00      100 K.W       30

 3.    Cattle & Poultry Feed        4.25       12 K.W        5

 4.    Stone Crusher               12.00       25 K.W       30

 5.    Automobile Workshop         10.00       10 K.W       10

 6.    Granite Cutting & Polishing 60.00       60 K.W       20

 7.    Aluminium Utensils           7.00       10 K.W       10

 8.    Fish-meal Products           5.00       10 K.W        8

 9.    Steel Furniture &            5.40       10 K.W        8

       Fabrication

10.    Vermicelli                   2.50        5 K.W        3

11.    Automatic Coir Yarn Unit     5.00       10 K.W       10

12.    Decorticated Coir Fibre     10.00       10 K.W        5

-----------------------------------------------------------------  

f) Rangeilunda Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.     Keora Essence             5.00         1 H.P       3

 2.     Plastic Moulded Goods     5.00        10 H.P       5

 3.     Corrugated Paper Box     20.00        20 K.W      12

 4.     Sophisticated            20.00        20 K.W      20

        Automobile Garage

 5.     Automobile Bodybuilding  25.00         15 K.W     15

        Unit

 6.     Pre-Cured Tyre           30.00         40 K.W     30

        Re-treading

 7.     Auto Miniature Lamp      25.00        10 K.W      30

 8.     Oil Seals                 5.00        10 K.W       5

 9.     Steel Re-rolling Mill   200.00       500 K.W      40

10.     Motel/ Way side          20.00        10 K.W      10

        Amenities Centre

11.     Steel Furniture &         5.00        10 K.W       5

        Fabrication

12.     Agricultural Implements  10.00        20 K.W      10

13.     Shrimp Hatchery         100.00       100 K.W      40

14.     Hotel Industries         80.00        40 K.W      10

15.     Foundry with Workshop    20.00        50 K.W      20

16.     Ceramic Glazed Tile      60.00        50 K.W      15 

-----------------------------------------------------------------  

III) Bhanjanagar Sub-Division

 

a) Bhanjanagar Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1. Steel Furniture & Fabrication   5.00       10 K.W       5

 2. Pre-cast Cement Products and    6.00       10 K.W      10

    RCC Spun Pipes /Diesel

 3. Agricultural Implements         6.00       10 K.W      10

 4. Cattle & Poultry Feed           8.00       15 K.W      15

 5. Rice & Poha Mill               15.00       20 K.W      10

 6. Chowmin, Noodles, Vermicelli    6.00        3 K.W      10

 7. Mechanised Bakery               4.50       10 K.W       8

 8. Plastic Moulded Goods           5.00       10 K.W       4

 9. Dry Cleaning                    1.20        5 K.W       9

10. Agarvati Manufacturing          5.00        2 K.W      25

-----------------------------------------------------------------  

b) Sorada Block

 

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

----------------------------------------------------------------- 

 

 1. Rice, Chuda, Flour, Dal Mill   10.00        20 K.W     10

 2. Gen. Fabrication & Steel        5.00        10 K.W      5

    Furniture

 3. Pre-cast Cement Product         4.00        Manual     10

 4. Leaf plate & cups               1.00        Manual      5

 5. Broom stick & other Forest      2.00        Manual      5

    Products

 6. K.B Bricks                      5.10        Manual     50

 7. Non-edible Oil Unit             4.00        5 K.W       5

 8. Bakery                          1.20        Manual      8

-----------------------------------------------------------------  

c) Sheragada Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1.  Rice, Dal, Poha, Flour Mill  10.00          40 K.W     10

 2.  Pre-cast Cement Product       5.00          manual      8

 3.  Gen. Fabrication & Steel      3.00          10 K.W     10

     Furniture

 4.  Radio & T.V Repair            1.00           1 K.W      3

 5.  K.B Bricks                    5.00           manual    30

-----------------------------------------------------------------  

d) Jagannath Prasad Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1.   Leaf cup & plate, broom       1.00        manual      5

      stick And other forest

      products 

 2.   Pre-cast cement products      1.00        1 K.W       5

 3.   Mini flour & Spices Grinding  2.50        5 K.W       4

 4.   Agarvati Manufacturing        0.50       manual       5

 5.   Gen. Fabrication & Steel      5.00       10 K.W       5

      Furniture

-----------------------------------------------------------------  

e) Aska Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

----------------------------------------------------------------- 

 

 1.  Sophisticated Rice/Chuda/      20.00       40 K.W      10

     Dal Mill

 2.  Steel Furniture & Fabrication   5.00       10 K.W       5

 3.  Engineering Workshop           10.00       20 K.W      10

 4.  Auto/Four Wheeler Garage        5.00       10 K.W       5

 5.  Soft Drinks & Aerated Water     4.00        8 K.W       6

 6.  Auto Body Building              4.20       10 K.W      10

 7.  PVC Pipes                      15.00       30 K.W      12

 8.  Data Processing & Software Dev. 4.00       10 K.W       5     

 9.  Industrial Alcohol/I.M.F.L/    20.00       50 K.W      20

     Distillery

10.  Mechanised Confectionery       20.00       30 K.W      12

11.  A.C Cement Pipes                8.00       20 K.W       5

-----------------------------------------------------------------  

f) Bellaguntha Block

-----------------------------------------------------------------

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

----------------------------------------------------------------- 

 

 1.  Brass & Bell Metal Utensils     2.50        10 K.W     5 

     (Mechanised) 

 2.  Chuda/ Dal Mill                10.00        40 K.W    10

 3.  Rice/ Poha                     10.00        40 K.W    12

 4.  Pre-cast Cement Products        6.00        manual    10

 5.  Printing Press (Mini Offset)    5.00         5 K.W     5

 6.  Food Processing Ind.            3.00         3 K.W     8

     (Pickles etc.)

 7.  Gen. Fabrication & Steel        5.00        10 K.W     5

     Furniture

 8.  Bakery Industry                 1.60         3 K.W     3

 9.  Aerated Water                   4.00         5 K.W     4

-----------------------------------------------------------------  

g) Dharakote Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1.   Rice/Chuda/Poha              15.00        40 K.W      10

 2.   Flour & Spices                1.00        10 K.W       5

 3.   Gen. Fabrication/ Steel       5.00        10 K.W       5

      Furniture

 4.   Pre-cast Cement Product       5.00        manual       5

 5.   Applique & Tent Works         1.00        manual       5

 6.   Bakery Products               1.00        manual       4

 7.   Agricultural Implements       5.00        8 K.W       10

-----------------------------------------------------------------  

h) Buguda Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

----------------------------------------------------------------- 

 

 1.   Filigree Works                2.00         1 H.P       5

 2.   Electrical Motor Rewinding    2.50         1 H.P       3

      Works

 3.   Rice/ Chuda/ Poha            10.00         40 K.W     10

 4.   Yarn Dying                    0.87         manual      5

 6.   Stone Crushing Unit           7.00         40 K.W     10

 7.   D.T.P & Computer              1.50          1 K.W      5

-----------------------------------------------------------------  

IV. Chatrapur Sub-Division

 

a. Chatrapur Block

-----------------------------------------------------------------

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.   Iron Oxide pigment             20.00      50 K.W      10

 2.   Washing Soap & Detergent        5.00       1 K.W       5

 3.   Gen. Fabrication & Steel        5.00      10 K.W       5

      Furniture

 4.   Pre-cast Cement Product &      10.00       1 K.W       5

      RCC Hume Pipes 

 5.   Poultry Feed & Cattle Feed      5.00       5 K.W       4

 6.   Cashew Processing Unit         10.00       1 K.W      30

 7.   Keora Essence                   4.50       1 K.W      10

 8.   PVC Wire & Cables              15.00      30 K.W      30

 9.   K.B Bricks                     10.00       manual     30

10.   Agricultural Implements         6.00      10 K.W       5 

11.   Welding Electrodes            114.00     100 K.W      20

12.   HDPE Woven Sacks              135.00     100 K.W      15

13.   Lime & Hydrated Lime           63.00      70 K.W      15

14.   Industrial Grease              10.00      60 K.W       8

15.   Pulp Board                      5.00      15 K.W      34

-----------------------------------------------------------------  

b) Ganjam Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.    Cashew Processing           15.00         manual    30

 2.    Ice Slab Unit                8.00         40 K.W    10

 3.    Gen. Fabrication & Steel     5.00         10 K.W     5

 4.    Pre-cast Cement Products     5.00         manual    10

 5.    Iodised Salt                85.00        100 K.W    20

 6.    Agricultural Implements      7.00         10 K.W    20

 7.    Chlorinated Paraffin Wax

-----------------------------------------------------------------  

c) Khallikote Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.    Particle Board               20.00       80 K.W      15

 2.    Cashew Processing            15.00       manual      30

 3.    Automobile Garage cum         5.00       10 K.W       5

       Servicing

 4.    Steel Furniture & Gen.        5.00       10 K.W       5

       Fabrication

 5.    Pre-cast Cement Products      5.00       manual      10

 6.    Tyre Resoling/Re-treading    10.00       40 K.W      10

       (Cold Process)

 7.    Cold Storage                100.00      250 K.W      30

 8.    Rice Mill                    10.00       40 K.W      25

 9.    De-cortication of Ground Nut  0.50        1 K.W       3 

-----------------------------------------------------------------  

d) Purusotampur Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1.    Modern Rice/Chuda/Poha       15.00       40 K.W     10

 2.    Gen. Fabrication & Steel      5.00       10 K.W      5

       Furniture

 3.    De-cortication of Ground Nut  0.50        1 K.W      3

 4.    Pre-cast Cement Products      5.70        manual    10

 5.    K.B Bricks                    5.00        manual    20

 6.    Foot wear Unit                1.80        1 K.W      5

 7.    Spices Grinding Unit          1.00        5 K.W      3

 8.    Washing Soap & Detergent      5.00       10 K.W      5

-----------------------------------------------------------------  

e) Kabisuryanagar Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.   Ayurvedic Medicine             1.80       5 K.W        5

 2.   Aluminium Circles & Utensils  30.00      50 K.W       10

 3.   Gen. Fabrication & Sheet Metal 5.00      10 K.W        5

      Works

 4.   Automobile Servicing &         1.00       5 K.W        5

      Repairing

 5.   Black Smithy/ Agri.Implements  4.00      10 K.W        5

 6.   Pre-cast Cement Products       5.00      manual        5 

-----------------------------------------------------------------  

f) Kodala Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------   

 1.    Rice & Chuda                10.00        40 K.W      5

 2.    Gen. Fabrication &           5.00        10 K.W      5

       Sheet Metal

 3.    Cashew Processing           10.00        manual     30

 4.    Pre-cast Cement Products     5.00        manual      5

 5.    Lia, Mudhi & Dobhaja         1.00        manual      3

 6.    Auto Servicing & Repairing   0.50         1 K.W      3

 7.    Chalk Crayon                 1.00        manual      3 

-----------------------------------------------------------------  

g) Hinjilicut Block

----------------------------------------------------------------- 

 Sl.    Projects identified       Total        Power      Emplo- 

 No.                              Capital      Required   yment

                                 Investment

                                 (Rs. Lacs) 

-----------------------------------------------------------------  

 1.    De-cortication of Ground Nut   1.00       1 K.W       3

 2.    Non-edible Oil                 5.00      10 K.W       5

 3.    Power Loom                     5.35       5 K.W      10

 4.    RCC Hume Pipes                 4.00       8 K.W      10

 5.    Offset Printing                5.00       5 K.W       3

 6.    Steel Furniture & Gen.         5.00      10 K.W       5

       Fabrication

 7.    Agarbati Manufacturing         2.00       1 K.W       5

 8.    Pre-cast Cement Products       3.00       manual      5
-----------------------------------------------------------------  

h) Polosora Block

 
------------------------------------------------------------------------------------------ 
 Sl.    Projects identified              Total          Power        Employment
 No.                                                Capital       Required        
                                               Investment
                                               (Rs. Lacs) 
------------------------------------------------------------------------------------------  
 1.    Power Loom                           5.35         5 K.W       10
 2.    Chowmin & Noodles            1.00         5 K.W        7
 3.    Spices Grinding                     1.05         5 K.W        5
 4.    Steel Furniture & Gen.         5.00        10 K.W        5
 5.    Lia & Mudhi                          0.85         manual       4
 6.    Mixture Product                    0.78         manual       4
 7.    Pre-cast Cement Products   3.00         manual       5

------------------------------------------------------------

Home