- O.S.E.B.-21 C
-
- ORISSA STATE ELECTRICITY BOARD
- APPLICATION FOR SUPPLY OF ELECTRICAL ENERGY
-
- To
-
-
The Chief Engineer,
-
Orissa State Electricity Board.
Dated the _________________
-
- Dear Sir,
- I, the undersigned on behalf of ____________________request you to
please submit an estimate to me for provision of service connections
and for supply of electrical power as per details given below. The
rate at which electrical energy is proposed to be supplie3d and other
condition of supply may please be forwarded with you estimate.
- I/We Am / are the owners/tenants of the said premises.
-
- 1.Postal Address of the applicant.
_________________________________________________
- 2.Premises at which power is required.
_________________________________________________
-
- 3.Purpose for which power is proposed to be used- Private,
Residence. Factory, Home, Industry, Irrigation-Pump, Domestic, Cinema, Workshop, Restaurant or Mill
-
- 4.Wheather the premises is provided with electric power
- if so, its nature and why this additional power is
required.
-
- 5. (a) If a factory or nature of manufacturing process and
- Whether it is manufacturing now or proposes
to do so.
- (b) Working hours/days of factory.
- (c) Demand during the hour's factory will be idle (KW)
-
- 6. (a)Load factor ____________ percent.
- (b) Maximum demand _______K.W.
- (c) M.D. expected during 5 P.M. to 10 P.M.
- (d) Voltage of supply required ________at 3 phase
50 cycles A.O.
-
- 7. (a) Guarented monthly minimum consumption, if any
- per K.W. or per 100 K.W. of maximum
demand/connected load.
-
- (b)Whether consumer accepts to pay for the minimum
guaranteed consumption
- if the consumption falls short of the guaranteed
figures.
-
- 8. Whether energy required on a permanet or temporary basis.
-
- 9. Period for which energy as required.
-
- 10. Wheather applicant accepts as to execute an agreement
- as per rules in force of the
Department.
-
- 11. DETAILS OF LOAD REQUIRED.
-
- (a)
GENERAL
- _________________________________________________________________________________
- Item No.
Nature of
demand
Number
Connected
Total Remarks.
-
(light, fan, motor etc)
load of each connected
-
point.
Load.
- _________________________________________________________________________________
- 1.
Light.
- 2.
Fans.
- 3.
Plug points.
- 4.
Plug points for
-
Domestic appliances,
-
e.g. iron cooker,
-
Refrigerator.
- 5.
Consignees.
- _________________________________________________________________________________
-
TOTAL